Sign In | Join Free | My enlightcorp.com |
|
Brand Name : KANGBO
Model Number : SC200/200
Certification : TUV
Place of Origin : Xiamen, China
MOQ : 1 unit
Price : Negocite
Payment Terms : L/C, T/T
Supply Ability : 300 units per month
Delivery Time : 25 days after down payment
Packaging Details : Shipped in container
Applicable Idustries : Hotels, Building Material Shops, Machinery Repair Shops, Manufacturing Plant, Farms, Construction works
Working mode : Mast Climbing
Drive unit : Motors and gearbox
Design : Modular
Material : Q355B cool roll steel plate
Processing : CNC machine tool and robots
Motor Control : VFC
Finishing : Sand blasting, paint, galvanised
SC200/200 Construction hoist lift 2000kg payload 46m/min speed
Product Overview
Construction Materials Lift Double/Single Cage Construction Hoist unit incorporates famous brand electric components and main parts in transmission mechanism. The steel structure is made of high-quality steel materials and welded with CO2 gas shield welding.Surface paint is made with imported raw materials in brilliant, long lasting colors. Construction Materials Lift is provided with reliable safety electrical / mechanical interlock devices, safety switches,breakage protection switch, upper and lower limits and limit switches, etc.
Progressive dropping safety device and safety protection hook are provided. The safety design and configuration fully comply to international standards.
FEATURES
1. High quality of motor, low noise
2. Strong load ability, low voltage start
3. Reasonable optimization design, compact structure, convenient installation and debugging
4. Running the lift elevator before the delivery
5. Driving mechanism refueling debugging, customer without refueling
6. Selects the high quality gear reducer and anti dropping device.
![]() |
SC200/200 Construction Hoist Lift 2000kg Payload 46m/Min Speed Images |